![Bitcoin Miner GRIID (GRDI) Shares Extend Drop After Nasdaq Listing Bitcoin Miner GRIID (GRDI) Shares Extend Drop After Nasdaq Listing](https://digitallifegaming.com/wp-content/uploads/2023/11/3P4MAZP725AG5EIZILIOYSHNDY-768x402.jpg)
[ad_1]
[gpt3] a new article in English that is SEO-optimized and incorporates as many relevant keywords as possible. The article should be based on the information provided in the existing post content. Additionally, please include a dedicated FAQ section and a conclusion section to enhance the reader’s experience
The company has 68 megawatts (MW) of electrical capacity and operates in Watertown, New York; Limestone, Maynardville and Lenoir City, Tennessee mining facilities. According to its latest filing, GRIID expects to expand its capacity to 436MW by the end of 2024.
[/]
[ad_2]
Source link